ECC Group was appointed by John Sisk to deliver construction consulting services for the development of a €325 million biopharmaceuticals contract manufacturing facility in Dundalk, Ireland.

The Work

To construct this state-of-the-art facility, the ECC team worked across a diverse range of areas throughout the project including site engineering, land and drone surveying and floor testing.

ECC Site engineers have been involved in the day-to-day management and setting out of the project, providing the latest technology 3D scanning equipment and floor testing equipment.

The Results

Partnering with ECC delivered efficient construction techniques that has increased efficiencies and led to overall project savings for the main contractor.

ECC take pride in our excellent relationships with clients and partners and our retention on the next phase of this project build is a testament to that. Key successes include:

  • Reduced construction costs
  • Delivered real cost savings
  • Build on time and to schedule
  • Use of latest cutting-edge technologies for time and cost savings

Sector

Industrial & Manufacturing

Location

Dundalk, Ireland

Client

WuXi Biologics

Start Date

2020

Project Status

Complete

Services

Site Engineering, Site Based Engineering Services, Environmental Reporting, Engineering Consultancy